Train Bulk Machine
working principle
When the transport vehicle enters the position, open the rod valve corresponding to the number of rods. Press and hold the "down button" of the control cabinet. After the unloading head is in place, the power supply to the lifting motor will be automatically disconnected. Press the "loading button" to enter the unloading state. The auxiliary equipment will start working accordingly. The dust generated by the unloading will pass through the feeding The bucket enters the dust collector for purification through the telescopic dust collection hose. When the material in the lower head is full, the lower head will raise while alarming. The rising distance must be set before loading. If the rising distance is 1 meter, adjust the time of the time relay to T=1/V. During the rising process, charging is always in progress. When the lower material head is full, repeat the above action. After reaching the full position, press the stop button to reversely brake the electric vibrator, or close the fan valve to stop the material loading. Other equipment Stop working accordingly. After parking, you can press the up button to keep the lower hopper away from the material at a certain distance to ensure the movement of the transportation tool, and then aim at the second unloading station. until the entire silo is filled.